1 Year Air Conditioning Refrigeration & Heat Exchange Parts with CE

US$1,500.00 1 Piece (MOQ)
Port:
Dalian, China
Transport Package:
International Packaging Method
Payment Terms:
L/C, T/T, D/P, Western Union, Paypal, Money Gram

Last Login Date:

Jun 26, 2025

Business Type:

Manufacturer/Factory

Main Products:

Prefabricated Steel Structure, Metal Sheet, Sandwich Panel, Cold Room, Decorative Sandwich Panel, Mobile Cold Room, Large Cold Room, Container House, Steel Purlin

Find Similar Products

Product Description

Company Info

Basic Info.

After-sales Service
Online Technical Support
Warranty
1 Year
Type
Air-Cooled
System Type
Fans Species
Frequency Fan
Noise Level
Low
Application Fields
Machinery
Certification
RoHS, UR, ISO, CE, CCC
Condition
After-Sales Service Provided
Online Support
Product Name
Industrial Refrigeration Equipment Air Cooler Cold
Voltage
380V/3p/50Hz
Color
White
Trademark
DONGAN
Specification
Origin
Heilongjiang China

Product Description

DHF series double-sided blowing air cooler is a kind of cooling equipment used in the food operation and processing room. lt is ventilated from both sides and has soft air supply. According to the applicable temperature can be divided into L, D type 2 series respectively, suitable for 0 'C,-18 'c cold storage use.
 
 
 
 
 
Fin Space:4.0mm
Capacity kW
Area m²
Pipe Vdm³
fan
Electrical Defrosting
Air flow m³/h
Dia.mm
Fan input W
volt V
input kw
volt V
5.5
22.8
2.5
4000
400
1×195
380
4
220
7.3
30.4
3.4
4000
400
1×195
380
6
220
10.1
42.0
4.4
8000
400
2×195
380
12
220
13.5
56.1
5.9
8000
400
2×195
380
12
220
16.8
70.0
7.2
12000
400
3×195
380
12
220
21.0
87.6
8.9
12000
400
3×195
380
12
220
28.0
116.8
11.7
16000
400
4×195
380
12
220
33.6
140.2
14.0
16000
400
4×195
380
12
220
FAQ

Q1: Can we accept the custom service and personalized design?
A: Yes, our professional engineering team can create a design based on customers' requirements.

 
Q2: How to pay?
A: We accept payment via T/T and irrevocable L/C at sight.
 
Q3: How to install?
A:Installation is easy and fast. We will provide a detailed installation video and instructions. If necessary, technicians can be sent to assist you on-site. However, buyers are responsible for the visa fee, tickets, accommodation, food, and wages of the technicians.
 
Q4: What is the delivery time?
A: Normally, the delivery time is 10-15 days after we receive the deposit.
Send your message to this supplier
Mr. Sam

Post a Sourcing Request Now

People who liked this also liked
Get Quick Quotes